General Summary
References & links follow
Run new roof to wall, build separate new roof for porch
Leave eaves open
Wall Removal & Brick Repair
References & links follow
View from the kitchen window
Remove cabinets at the entry of the master
Must be durable washable paint, satin walls, eggshell ceiling and semi-gloss trims & doors.
Same color for all interior!!
Must be durable washable durable exterior paint.
If existing floors can’t be saved, please discuss options. A selection has already been reviewed at Terri Bros with an example of desired style on this page.
Wider boards are a preference. Lighter colored hardwood or engineered hardwood.
Contact Dianna if you’ve already arrived at this part of the project and need details. Things to remember: outdoor shower/bathtub will be on the back porch/decking area. A plunge pool may be installed at some stage.
Don’t forget to replace back tap since the old one will be gone when the slab is laid.
Fixtures are to be very specific and chosen right before time of install.
Contact: Whatsapp: +1615 974 2957 | Email: hello@hellocmo.net